Works on the Leeds Flood Alleviation Scheme Phase 2 set to begin in Apperley Bridge
In March 2022, works will begin to reduce the likelihood of flooding in Apperley Bridge as part of the Leeds Flood Alleviation Scheme Phase 2 (Leeds FAS2). The works will run alongside the River Aire as it flows through the village, from the area of Bottom Farm on Apperley Road up to Harrogate Road,…